The mural was rolled up at the City Center and then installed in December 2001 by Art Specs, with assistance from Tim Grande.

 
 
       
 

A wooden-frame structure was attached to the wall and the canvas was pulled up in front of it with a pulley attached to a bar. After stapling the canvas to the wood, a frame was attached around the edges. The unveiling came with the removal of the scaffolding.

The Installation Celebration was on January 12th.